Badged, credentialed and already on the installation
Cannon has delivered power, telecommunications and directional drilling work on military installations for more than two decades. Crews are badged and DBIDS credentialed where the work is, the information security program is built to the federal standard, and the same supervision runs the job whether the contract is held direct, through a prime or inside a joint venture.
More than fifty installations nationwide, every branch of service
Cannon has worked on more than fifty installations for the Army, Navy, Marine Corps, Air Force, Coast Guard, NAVFAC, USACE and the civilian agencies of the Department of Defense. Crews hold base credentials and work to USACE EM 385-1-1, with activity hazard analyses submitted before each activity, weekly training records and toolbox talks filed, and daily reports routed through the owner's project management system. The work runs nationwide and across the Pacific, from Alaska and the Pacific Northwest to MacDill in Florida, Hickam in Hawaii, Guam and Kwajalein. The map shows installations where Cannon has worked and the offices the crews work from; the cards below are recent examples, not the full list.
- Milton, Washington (headquarters)
- Seattle, Washington
- JBLM, Washington
- Kalama, Washington
- Winthrop, Washington
- Gilbert, Arizona (regional hub)
- Dixon, California (regional office)
- Salt Lake City metro, Utah (satellite office)
- Joint Base Lewis-McChordAlutiiq Roads Project Communication and Power Duct, Fort LewisBuilding 7 Category 6 Premise WiringClover Creek Switching StationFaith RSU- JBLMand 13 more
- NAVFAC Northwest: Bangor, Everett, Indian IslandIndian Island Shore Power ExtensionNaval Base Kitsap Bangor Fiber InstallationNaval Base Kitsap Bangor Substation 1 RepairNaval Station Everett Distribution Feeder Repair
- NAS Whidbey IslandNAS Whidbey Island Squadron Hangar Recabling
- Yakima Training CenterYakima Training Center Outside Plant Upgrades
- Fairchild AFBFairchild AFB Outside Plant Upgrades
- Beale AFBBeale AFB Outside and Inside Plant Upgrade
- Travis AFBTravis AFB Outside and Inside Plant Infrastructure Upgrades
- VandenbergVandenberg AFB Base-Wide Infrastructure Upgrade
- Edwards AFBEdwards AFB Base-Wide Telecommunications Survey and Infrastructure Build
- Camp PendletonCamp Pendleton Outside Plant Upgrades
- Mountain Home AFBBase-Wide Telecommunications Infrastructure Surveys and Fiber Testing
- Fort HuachucaFort Huachuca Telecommunications Infrastructure Upgrade
- Kirtland AFBKirtland AFB Outside Plant Infrastructure
- Fort BlissFort Bliss Outside Plant and Pathway Build
- Cheyenne Air National GuardCheyenne Air National Guard Fiber Infrastructure
- IRS facilities: Denver and Salt Lake CityIRS Facility Network Upgrades: Seattle, Denver and Salt Lake City
- Tinker AFBTinker AFB Outside Plant
- Fort CampbellAT&T- Ft. Campbell
- Wright-Patterson AFBBase-Wide Telecommunications Infrastructure Surveys and Fiber Testing
- Langley AFBLangley AFB Outside Plant Backbone Upgrade
- Fort JacksonFort Jackson I3MP Base-Wide Upgrade
- Eglin AFBBase-Wide Telecommunications Infrastructure Surveys and Fiber Testing
- MacDill AFBMacDill AFB 34.5kV Tie Circuit Cable Installation
- JBER and Fort RichardsonCACI Alaska Fiber Backbone at Fort Greely, Fort Wainwright and JBERElmendorf, Fort Richardson, Fort Wainwright and Fort Greely Fiber Backbones
- Fort WainwrightCACI Alaska Fiber Backbone at Fort Greely, Fort Wainwright and JBERElmendorf, Fort Richardson, Fort Wainwright and Fort Greely Fiber Backbones
- Fort GreelyCACI Alaska Fiber Backbone at Fort Greely, Fort Wainwright and JBERElmendorf, Fort Richardson, Fort Wainwright and Fort Greely Fiber Backbones
- Joint Base Pearl Harbor-HickamJoint Base Pearl Harbor-Hickam Survey, Design and ISP/OSP Upgrade
- Andersen AFB, GuamAndersen AFB Flight Line, Premise Wiring and Electrical Upgrades
- Kwajalein AtollKwajalein Atoll Fiber Optic Infrastructure
- Twentynine Palms
- Fort Detrick
- Fort Meade
- Picatinny Arsenal
- Fort Polk
- Presidio
- Fort Rucker
- Cape Cod
- Cavalier
- Clear SFS
- Buckley
- LA SFS
- Peterson
- New Boston
- Patrick SFS
- Cape Canaveral
- Fort Riley
- NAS JRB Fort Worth
- Youngstown
- Homestead
- Westover
- Cannon AFB
- Corpus Christi
- Bremerton
- KitsapManchester Fuel Depot
- Lincoln ANG
- Fort Shafter
- Eielson AFB
- Offices (8)
- Installations and federal sites (57)
- Hover or tap a marker for the name and any project write-ups.
Joint Base Lewis-McChord
The longest relationship on the list. Power line enhancements, switching station construction, SCADA pole installation, premise wiring, grounding and lightning protection, and the Gray Army Airfield microgrid high voltage scope.
MacDill Air Force Base
Medium voltage underground cable work, delivered with Cannon supervision on site and locally referred craft under the prime contractor's license and federal enclave provisions.
Naval Base Kitsap Bangor, Naval Station Everett, Naval Magazine Indian Island
Shore power, substation repair, distribution repair and installation electrical work for NAVFAC Northwest through prime contractors.
Fort Greely, Fort Wainwright and JBER
More than 40 miles of new fiber backbone engineered, permitted and built for the Department of Defense through CACI, with 250,000 feet of fiber deployed and 1,800 strands spliced and tested.
Also: Fort Campbell (fiber infrastructure build-out, outside and inside plant), McChord Field (CITS telecommunications infrastructure upgrade across 27 buildings) and King County's PSERN public safety radio network. Earlier base-wide programs, many of them end-to-end from survey through cutover, include Fort Jackson, Fort Bliss, Fort Huachuca, Camp Pendleton, Joint Base Pearl Harbor-Hickam, Andersen Air Force Base on Guam, Kwajalein Atoll, and Vandenberg, Edwards, Beale, Travis, Kirtland and Langley Air Force Bases.


Power, telecom, drilling and engineering on base
Each scope below is planned to USACE EM 385-1-1, run with badged crews and closed out with the documentation an installation's contracting office expects.
Power
- Overhead and underground distribution, 5kV through 35kV
- Pole replacement, reconductor and feeder rebuilds
- Substation and switching station construction
- Medium voltage splicing and terminations
- Grounding grids and UL 96A lightning protection
- Microgrid, generation and battery storage site electrical
- Shore power and service extensions
Communications
- Fiber backbone, duct bank, manhole and vault systems
- Aerial and underground fiber and copper
- Splicing, OTDR testing and certification
- Category 6 and 6A premise wiring to TIA 606-B
- Telecommunications rooms, racks and cabinets
- SCADA, DAS and wireless access points
- Live cutovers in occupied facilities
- Base-wide infrastructure surveys and flight line communications
Drilling and engineering
- Horizontal directional drilling, including rock
- Bored road, rail and river crossings
- Trenching and cable plowing for duct and fiber
- Base-wide infrastructure surveys
- Route design, permitting and construction-ready plan sets
- As-built documentation and closeout packages
Built to the federal standard
Information security
A contractor on a federal or utility network holds circuit maps, as-builts, switching records and route data. Cannon handles that material inside an environment built to the NIST SP 800-171 control set and is CMMC Level 2 compliant, aligned to ISO 27001 and IT Service Management principles and supported by a Registered Provider Organization. Access control, audit and accountability, incident response, media protection and physical protection are assessed and reviewed on a regular cycle.
Safety on the installation
Work is planned and performed to USACE EM 385-1-1. Cannon's Washington L&I experience factor is 0.6947 (effective January 1, 2026); the NCCI rate outside Washington is 1.00. Read more on the safety page, and see how environmental controls are carried on every site.
Labor and payroll compliance
Davis-Bacon and Service Contract Act wage determinations, certified payroll through LCPtracker and eMars, and workforce development run to Affirmative Action Program and Federal Acquisition Regulation requirements.
Ownership and small business status
Cannon is owned by Bristol Bay Native Corporation, an Alaska Native regional corporation established under the Alaska Native Claims Settlement Act of 1971. Under 43 U.S.C. 1626(e), Alaska Native corporations and their subsidiaries are federally identified as minority and economically disadvantaged business enterprises. Cannon is a federally recognized Small Disadvantaged Business, a certified Minority Business Enterprise through NMSDC, and a Disadvantaged Business Enterprise through Washington OMWBE. That status counts toward subcontracting plan goals and supplier diversity commitments, with certification documentation provided at award.
Registrations
- NAICS
- 237130 Power and Communication Line, 238210 Electrical Contractors, 237110 Water and Sewer Line, 237310 Highway, Street and Bridge
- Cannon Construction, LLC
- CAGE 1KTV5 | UEI C8MNSENHM6M1 | DUNS 17-380-4212
- Cannon Constructors, LLC
- CAGE 7XPG7 | UEI U4QXVN8P4DW3 | DUNS 08-074-7339
- Bonding
- $100 million+ single project, $500 million+ aggregate, Liberty Mutual, rated A (Excellent) XV by AM Best
Direct, through a prime, or in a joint venture
Prime contractor
Direct awards from the US Army Corps of Engineers and municipal and public power owners, including the Gingko to Main repair line and the King County PSERN power extension.
Subcontractor to a prime or EPC
Installation work for NAVFAC Northwest, the Defense Logistics Agency and USACE through primes such as City Light & Power JBLM, which holds the 50-year utility privatization contract at JBLM and has held a master service agreement with Cannon for years.
Joint ventures
The Orion-Cannon joint venture held a five-year MATOC at JBLM from 2017 covering tenant improvements, outside and inside plant communications and power upgrades. The Bristol-Cannon joint venture built a new overhead and underground power line between two JBLM substations, closing with CPARS ratings from Very Good to Exceptional.
Federal projects
A sample of recent past performance. Project write-ups are on the federal projects page.
| Project | Installation | Scope |
|---|---|---|
| CACI Alaska PAC OSP-O fiber optic installation | Fort Greely, Fort Wainwright, JBER | 40+ miles of backbone engineered, permitted and built; 250,000 ft of fiber; 100 pedestals, 7 vaults, 1,800 strands spliced |
| Gray Army Airfield microgrid | JBLM | Site development and high voltage construction for a battery storage and natural gas generation plant: grounding grid, duct runs, medium voltage, SCADA, equipment setting |
| Power line enhancements | JBLM | 47 new poles, 36,975 ft of 336 ACSR, SCADA-ready pad mount switches, 5,370 ft of 15kV cable |
| Clover Creek switching station | JBLM | New distribution switching station, grounding grid, 13,140 ft overhead and 10,970 ft underground conductor |
| ISDC7 and ISDC8 SCADA poles | JBLM | Composite poles 75 to 140 ft set by crane with antennas, grounding and ethernet for a wireless SCADA system |
| Grounding and lightning protection, 10 facilities | JBLM | UL 96A systems on eight buildings, fall-of-potential testing, UL master label certification |
| Building 7 premise wiring | JBLM | 60,000 ft of Category 6 across 98 locations, cut over in an occupied facility |
| ERTSS cable installation | MacDill AFB | 34.5kV underground cable |
| Shore power and distribution | Indian Island, Naval Station Everett, NBK Bangor | 13.8kV distribution upgrade, shore power, substation and distribution repair |
| Fiber infrastructure build-out | Fort Campbell | 239,094 ft of trench conduit, 34 miles of concrete-encased duct bank, 250 racks and 153 wall cabinets |
| CITS telecommunications upgrade | McChord Field | 18,400 ft of duct bank, 20 vaults, 65,000 ft of fiber across 27 buildings |
Browse the federal project gallery. Full project sheets and references are available on request.
What clients say
Cannon Construction, Inc., has been providing excavation service for the Light Division of the City of Tacoma, Department of Public Utilities for the past few years. They have provided roadway crossings; both open cuts and conduit push. They have a skilled staff that provides superior work.
M. A. Fesharaki, P.E., New Services Engineering Supervisor, Tacoma Public Utilities, Light Division
Work done for Elmhurst Mutual by Cannon Construction has been exceptional. The employees work in a very professional manner and are exceptionally safety conscious. Elmhurst Mutual Power & Light Company highly recommends Cannon Construction as a contractor who can successfully construct a project in an expeditious manner and with desired results.
George Hollingsworth, Operations Manager, Elmhurst Mutual Power & Light Company
I know when I send a Cannon Construction crew to do the job I can count on quality people and quality equipment to do a professional job from start to completion.
Dave Lemke, Construction Supervisor, Viacom Cablevision, Tacoma
Thank you for sending a crew out yesterday to put the pull line in the conduit. The two of them were determined to get the job done. They were both very hard workers and cared about the quality of their work. Both were very professional people.
Wexler Property Group, Snohomish, WA
The drilling team was great to work with and I'm still impressed with a 1,000' pull back in 5 hours.
Project Engineer, City of Snoqualmie
We wanted to impart our gratitude for your prompt response in allocating and dispatching crews to assist our Comcast teams in restoring service to our customers after the bomb cyclone storm. We greatly appreciate the long hours put in, especially over the Thanksgiving holiday.
Senior Director, Construction, Comcast, Pacific Northwest Region
Planning work on an installation?
Send the scope and the base. Cannon will come back with the right contracting path and a team that already holds the credentials.