Travis AFB Outside and Inside Plant Infrastructure Upgrades
Cannon's outside and inside plant infrastructure upgrades at Travis Air Force Base in Fairfield, California brought new fiber to 185 buildings serving more than 10,000 users. The inside plant scope covered 268 communication closets and nine information transfer nodes with 11,000 feet of ISP cable. Outside, crews directional drilled about 13,000 feet, set 37 manholes and handholes and installed more than 47,000 feet of conduit.
Services Employed:
- New fiber cable to 185 buildings serving more than 10,000 users
- 268 communication closets and nine information transfer nodes
- 11,000 feet of inside plant cable
- Approximately 13,000 feet of directional drilling
- 37 manholes and handholes placed
- More than 47,000 feet of conduit installed
More Federal work
Related projects
FederalMcChord Field CITS Telecommunications Infrastructure Upgrade
McChord Field, WA
Cannon was contracted by General Dynamics to execute a comprehensive upgrade to the telecommunications infrastructure at McChord Field, a mission-critical project covering both outside...
View projectPower
JBLM Grounding and Lightning Protection, 10 Facilities
JBLM, WA
Grounding and lightning protection system upgrade across ten facilities at Joint Base Lewis-McChord, enhancing the safety and compliance of critical military buildings against lightning...
View projectFederal
Building 7 Category 6 Premise Wiring
JBLM, WA
In the modernization of Building 7 at Joint Base Lewis-McChord, Cannon engineered, provisioned and implemented a Category 6 horizontal cable system to replace the...