Fairchild AFB Outside Plant Upgrades
Outside plant upgrades at Fairchild Air Force Base near Spokane: 30,000 feet of conduit, 32 manholes, 40,000 feet of rock sawing and 12,000 feet of directional drilling, all GPS located and as-built.
Services Employed:
- 30,000 lineal feet of conduit installed
- 32 manholes placed
- 40,000 lineal feet of rock sawing
- 12,000 lineal feet of directional drilling
- GPS locating and as-builts
More Federal work
Related projects
FederalMcChord Field CITS Telecommunications Infrastructure Upgrade
McChord Field, WA
Cannon was contracted by General Dynamics to execute a comprehensive upgrade to the telecommunications infrastructure at McChord Field, a mission-critical project covering both outside...
View project- Power
JBLM Grounding and Lightning Protection, 10 Facilities
JBLM, WA
Grounding and lightning protection system upgrade across ten facilities at Joint Base Lewis-McChord, enhancing the safety and compliance of critical military buildings against lightning...
View project - Federal
Building 7 Category 6 Premise Wiring
JBLM, WA
In the modernization of Building 7 at Joint Base Lewis-McChord, Cannon engineered, provisioned and implemented a Category 6 horizontal cable system to replace the...
View project
Planning something similar?
Our estimators and project managers can walk you through approach, schedule and scope.