Cheyenne Air National Guard Fiber Infrastructure
For the Air National Guard in Cheyenne, Wyoming, this job opened with a GPS survey of all new construction and a CFLD file for the base records, then excavated and installed 24 manholes and 8,000 feet of conduit, directional bored another 4,000 feet, installed 35,000 feet of Maxcell and 40,000 feet of fiber, terminated more than 1,600 strands and fitted 18 buildings with pliable raceway, fiber distribution panels, racks and cabinets.
Services Employed:
- GPS survey of all new construction and CFLD file created
- 24 manholes excavated and installed
- 8,000 feet of conduit systems excavated and installed
- 4,000 feet of conduit directional bored
- 35,000 feet of Maxcell and 40,000 feet of fiber optic cable installed
- More than 1,600 strands of fiber terminated
- Pliable raceway, fiber distribution panels, racks and cabinets installed in 18 buildings
More Federal work
Related projects
FederalMcChord Field CITS Telecommunications Infrastructure Upgrade
McChord Field, WA
Cannon was contracted by General Dynamics to execute a comprehensive upgrade to the telecommunications infrastructure at McChord Field, a mission-critical project covering both outside...
View project- Power
JBLM Grounding and Lightning Protection, 10 Facilities
JBLM, WA
Grounding and lightning protection system upgrade across ten facilities at Joint Base Lewis-McChord, enhancing the safety and compliance of critical military buildings against lightning...
View project - Federal
Building 7 Category 6 Premise Wiring
JBLM, WA
In the modernization of Building 7 at Joint Base Lewis-McChord, Cannon engineered, provisioned and implemented a Category 6 horizontal cable system to replace the...
View project
Planning something similar?
Our estimators and project managers can walk you through approach, schedule and scope.