Projects
Outside Plant
Aerial and underground fiber, coax and copper builds for carriers, utilities and public agencies across the West.
Outside PlantCity of Lakewood Traffic Signal Fiber Interconnect, Phase III
Lakewood, WA
For Phase III of the City of Lakewood's traffic signal upgrade, Cannon placed more than 18,000 feet of fiber optic cable by aerial and...
View project
FederalCheyenne Air National Guard Fiber Infrastructure
Cheyenne, WY
For the Air National Guard in Cheyenne, Wyoming, this job opened with a GPS survey of all new construction and a CFLD file for...
View projectOutside Plant
Puyallup School District Pole Survey and Design
Puyallup, WA
Cannon surveyed 1,050 existing poles across 30 miles for the Puyallup School District to plan future network infrastructure. Services Employed: 1,050 existing poles surveyed...
View project
FederalAlutiiq Roads Project Communication and Power Duct, Fort Lewis
Fort Lewis, WA
For Alutiiq's roads project on Fort Lewis, Cannon built the communication and power duct system beneath the rebuilt roadway: 12,000 feet of 6-way and...
View projectFederal
Naval Base Kitsap Bangor Fiber Installation
Bangor, WA
A secure-site fiber job at the Bangor naval base on Hood Canal: 70,000 feet of fiber pulled, 4,200 strands spliced, 22,000 feet of rod...
View project
Outside PlantBill & Melinda Gates Foundation Live Fiber Relocation
Seattle, WA
This job exposed the live fiber optic cable serving the Bill & Melinda Gates Foundation in Seattle and relocated it clear of an upcoming...
View projectOutside Plant
SR 520 Bellevue Way Live Fiber Relocation for Verizon and Comcast
Bellevue, WA
For the rebuild of the SR 520 Bellevue Way overpass, Cannon relocated four live Verizon and Comcast fiber optic cables without an outage or...
View project
Inside PlantAmazon Network Interconnect
Seattle, WA
Cannon's network interconnect for Amazon in Seattle intercepted live fiber in three areas, set vaults, excavated and placed a new duct system, ran two...
View project
Directional DrillingAT&T MTSO Fiber Route, Spokane
Spokane, WA
For AT&T's mobile telephone switching office in Spokane, Cannon directional bored 3,200 feet, trenched 5,000 feet, placed 14 manholes and 9,000 feet of fiber...
View project
Have a project like these?
Tell us what you are building and we will put the right team in front of you.