Directional Drilling
Trenchless crossings of highways, rivers and rail, through rock and cobble, with rigs from 9,000 to 250,000 pounds of pullback.
FederalTinker AFB Outside Plant
Oklahoma City, OK
Cannon built the outside plant at Tinker Air Force Base in Oklahoma City: 50 manholes, more than 20,000 feet of directional drilling, 42,000 feet...
View project
FederalYakima Training Center Outside Plant Upgrades
Yakima, WA
Cannon completed outside plant infrastructure upgrades at the Army's Yakima Training Center, rock sawing more than 35,000 feet, directional drilling over 16,000 feet, plowing...
View project
FederalFairchild AFB Outside Plant Upgrades
Spokane, WA
Outside plant upgrades at Fairchild Air Force Base near Spokane: 30,000 feet of conduit, 32 manholes, 40,000 feet of rock sawing and 12,000 feet...
View project
Directional DrillingQwest Outside Plant Maintenance, Relocations and Emergency Call-Out
Washington and Oregon
From the mid-2000s Cannon carried general construction and maintenance for Qwest in Washington and Oregon with 24-hour emergency call-out service. The King County general...
View project
Directional DrillingTime Warner and AboveNet Puget Sound Networks
Puget Sound, WA
Through the 2000s Cannon built network extensions across the Puget Sound region for two fiber carriers, Time Warner Telecommunications and AboveNet Communications: aerial fiber...
View project