Our work
Projects
Selected work from the power, telecommunications, drilling, civil and engineering teams. Every project here was self-performed by Cannon crews.
PowerFaith RSU- JBLM
Services Employed: Trench and install 6 and 12 way conduit system (400 LF) Excavate and install communication and power maintenance vaults Demo existing duct...
View project
Outside PlantWestlake Metropolitan Tower
Seattle, WA | ISP
Installed new backbone and horizontal cabling to support 350 units in the complex. All cabling installed, tested, terminated and labeled in accordance with current industry and...
View project
PowerTurner Strategic Technologies
Turner Stategic Technologies- JBLM, WA | Electrical
Joint Base Lewis-McChord’s distribution system is a single-point-grounded system operating at 13,800 volts. Joint Base Lewis-McChord has adopted Tacoma Public Utilities (TPU) design criteria...
View project
CivilDMCI – Pine Street Plat
Tacoma, WA | OSP
Clearing and grubbing of entire (5) acre site for apartment buildings, garages, rec center, playground, sidewalks, and all utility work. Mass excavation to include;...
View project
Power3A Roads
JBLM, WA | Electrical
The 3A Road project's goal is to upgrade and relocate electrical infrastructure on a section of Joint Base Lewis-McChord. Services Employed: Underground vault placement...
View project
Outside PlantZayo – Fiber Relocate
Bellevue, WA | OSP
Removed a fiber optic vault and duct bank and suspended aerially to accommodate a Fish Culvert placement by the Washington State Department of Transportation...
View project
Outside PlantKing County Fiber
Tukwila, WA | OSP
Install new pathway and cabling to support an upgraded single mode backbone at the South Base. This project entailed a new build in an...
View project
FederalJBLM SOF-COF
Joint Base Lewis-McChord, WA | Inside Plant
Services Employed: Installed 10k of Fiber Optic backbone cabling 336 Fiber terminations; 264 fiber strands spliced and tested 4,500 feet of 1800 pair copper...
View project
Outside PlantAT&T Vault Project
Seattle, WA | OSP
Placement of fiber optic utility vaults in four separate locations in the central business district of Seattle. Unique challenges were excavating amongst existing congested...
View project
Have a project like these?
Tell us what you are building and we will put the right team in front of you.