Christa Ministries Campus Cabling
Cannon cabled 60 buildings on the Christa Ministries campus in Shoreline, Washington: 270,000 feet of Category 6, 41,000 feet of multimode fiber optic cable, 33,000 feet of RG6 coax and 6,300 feet of 6 inch cable tray.
Services Employed:
- 60 buildings cabled
- 270,000 feet of Category 6 cable
- 41,000 feet of multimode fiber optic cable
- 33,000 feet of RG6 coax
- 6,300 feet of 6 inch cable tray
More Inside Plant work
Related projects
FederalMcChord Field CITS Telecommunications Infrastructure Upgrade
McChord Field, WA
Cannon was contracted by General Dynamics to execute a comprehensive upgrade to the telecommunications infrastructure at McChord Field, a mission-critical project covering both outside...
View project- Federal
Building 7 Category 6 Premise Wiring
JBLM, WA
In the modernization of Building 7 at Joint Base Lewis-McChord, Cannon engineered, provisioned and implemented a Category 6 horizontal cable system to replace the...
View project
Inside PlantGPON MSA
Installation of fiber to the unit (FTTU) for multiple Multi-Dwelling Units (MDUs) and Single Family Units (SFUs). All cabling is installed, tested, terminated, and...
View project
Planning something similar?
Our estimators and project managers can walk you through approach, schedule and scope.