Senior Resident Engineer, Seattle City Light
This crew performed at a very high level of efficiency, safety, and competency during the drilling and installation of the conduit. They took extra time to verify what was actually in the bore path to avoid damage to the existing underground utilities. I look forward to working with any crew from Cannon Companies in the future.
This crew performed at a very high level of efficiency, safety, and competency during the drilling and installation of the 2 – 4″ HDPE, Schedule 80 conduit. Shawn and the crew were very cautious when working around the locate marks on the ground. They took extra time to verify what was actually in the bore path to avoid damage to the existing underground utilities. Shawn and Austin’s knowledge of the drilling process and locating the drill head along with Tobias and Jacob’s desire to assist with the drilling, hydro excavating, and keeping the neighborhood clean has made a very positive impression with me and the neighbors. I look forward to working with any crew from Cannon Companies in the future.
Comments are closed.