AT&T- Ft. Campbell
Base wide Fiber Infrastructure Build-Out. OSP Engineering/Design, Outside Plant (OSP), Inside Plant (ISP), and associated final deliverables including Auto CAD final drawings.
Services Employed:
- $15MM contract
- 80 field personnel
- 7 subcontractors
- 65 miles of direct bury plow on the range 115 HHs
- 34 miles of concrete encased duct bank in the main base cantonment area 123 MH and HHs
- 250 buildings ISP work splicing, testing and terminating fiber
- 250 network switches to facilitate a new base wide fiber infrastructure build-out
OSP:
ISP: