AT&T- Ft. Campbell

Base wide Fiber Infrastructure Build-Out. OSP Engineering/Design, Outside Plant (OSP), Inside Plant (ISP), and associated final deliverables including Auto CAD final drawings.

Services Employed:

  • $15MM contract
  • 80 field personnel
  • 7 subcontractors
  • 65 miles of direct bury plow on the range 115 HHs
  • 34 miles of concrete encased duct bank in the main base cantonment area 123 MH and HHs
  • 250 buildings ISP work splicing, testing and terminating fiber
  • 250 network switches to facilitate a new base wide fiber infrastructure build-out

OSP:

  • Trench Conduit – 239,094’
  • Pull Maxcell – 296,208’
  • Pull Fiber – 537,258′
  • Pull Copper – 8,470’
  • Plow fiber – 253,170’
  • Casing Bore – 1,135’
  • HDPE Bore – 5,650’
  • Install – 103 MH
  • Install- 140 HH

ISP:

  • Install 4” RGS – 250’
  • Install Backboards – 105
  • Electrical Circuits – 113
  • Horizontal WM – 267
  • COPP – 123
  • FOPP – 224
  • Core Walls – 208
  • Ground Cable – 13,987’
  • Wall Cabinets – 153
  • Racks – 14

Location

Ft. Campbell, Kentucky / Tennessee | OSP | ISP