Projects / Federal

Langley AFB Outside Plant Backbone Upgrade

Cannon upgraded the outside plant backbone at Langley Air Force Base in Virginia, installing more than 250,000 feet of innerduct, 160,000 feet of Maxcell and 175,000 feet of fiber cable, directional drilling 17,500 feet, trenching 20,000 feet and placing 123 handholes and 12 manholes.

Services Employed:

  • More than 250,000 feet of innerduct installed
  • 17,500 feet of directional drilling
  • 123 handholes and 12 manholes placed
  • 20,000 feet of trenching
  • 160,000 feet of Maxcell and 175,000 feet of fiber cable installed