Beale AFB Outside and Inside Plant Upgrade

One of six federal projects Cannon had running at once, the Beale Air Force Base job in Northern California combined outside plant and inside plant on one contract: 35,000 feet of trenching, 55 manholes and handholes, 74,000 feet of Maxcell and 280,000 feet of fiber optic cable, with the inside plant wiring carried into 120 buildings.

Services Employed:

  • 35,000 feet of trenching
  • 55 manholes and handholes placed
  • 74,000 feet of Maxcell placed
  • 280,000 feet of fiber optic cable placed
  • Inside plant wiring of 120 buildings