Building 7 Category 6 Premise Wiring
In the modernization of Building 7 at Joint Base Lewis-McChord, Cannon engineered, provisioned and implemented a Category 6 horizontal cable system to replace the legacy Category 5e cabling within an active, occupied facility without disrupting operations. The work mapped cable routes, wall penetrations, telecommunications room layouts and workstations to the TIA 606-B cabling standard, installed approximately 60,000 feet of Category 6 cable across 98 locations, certified the new infrastructure and migrated services with the removal of the obsolete cables.
Services Employed:
- Detailed engineering and survey effort to devise a cutover plan that ensured uninterrupted service
- Approximately 60,000 feet of Category 6 cable installed across 98 locations
- Comprehensive certification of the new telecommunications infrastructure
- Seamless migration of services to the new cabling system
- Removal of obsolete cables to maintain system integrity
- Telecommunications rooms and workstations laid out to TIA 606-B
- Work performed in an active, occupied facility
- Accurate as-built certifications delivered to the client