Gorge Amphitheater – Live Nation
Gorge Amphitheater and Gorge campground waste water system improvement project.
Installed gravity waste water collection system for comfort stations, shower trailers, and retail food locations. Constructed evaporation lagoons, and restored roadways and campground areas to original conditions.
Services Employed:
- 18,000 Feet of Sewer Lines, man holes, pumps, and associated hardware
- Installed (2) 8,000 gallon holding tanks with float alert alarm system.
- Trenched and installed 2″ / 3″ / 4″ forced sewer mains.
- Provided required electrical connections and services.