Elliot Marsh

Upgrade water system at Elliot Marsh. Installed and tested 9,000’ of 12” ductile Iron Pipe replacing existing A/C Pipe while maintaining existing water service with minimum outages.

Services Employed:

  • Installation of 9,000’ of 12” ductile iron pipe
  • Placed 5 fire hydrants
  • Installed 15 new water services

Categories

Location

JBLM, WA | Civil