Elliot Marsh
Upgrade water system at Elliot Marsh. Installed and tested 9,000’ of 12” ductile Iron Pipe replacing existing A/C Pipe while maintaining existing water service with minimum outages.
Services Employed:
- Installation of 9,000’ of 12” ductile iron pipe
- Placed 5 fire hydrants
- Installed 15 new water services